# Colour Indication on TCS
GRAY : LOCKED
BLUE : BLOCKED
# How to set Route ?
1. Click on signal
{ Then , route will become free & pink triangle will pop up }
2. Right Click on Signal again
3. Click on Entrance / Exit Select
4. Click on Transmit
# How to Give Speed restrictions on Mainline ?
1. Right Click on route
2. Click on Speed Restrictions
# TCS works with the data of ATP AND AFO
# MLK ( MICROLOCK )
ज्याला data मिळतो PBI ( processor Based Interlock ) कडून
# आपल्याकडे 4 PBI आहेत , त्यांचे LOCATION असे :
1. GMC
2. WAD
3. CHR
4. WADALA DEPOT
5 Naigaon
PBI चा data TCS SERVER कडे जातो , तोच OCC ला दिसतो
# ATP ( 1AUTOMATIC TRAIN PROTECTION )
27 MHz ने data पाठवला जातो ( train to antenna )
74 MHz ( antenna to train )
2 TYPES OF ATP
FIXED : GIVES SPEED , SHOWS DISTANCE TO GO , LOCATION , GRADIENT / CURVE
VARIABLE : cable connected , SPEED RESTRICTED ( TSR ) , release speed , signal aspect ( own and next )
__________♀________________________♀
◆ ∆. ¿¿.
VARIABLE & FIXED ATP \ AFO
GAP BETWEEN FIXED ATP & AFO IS CALLED
" OVERLAP".
BEOP : BEST ESTIMATED OPERATIONAL POSITION
ETLS : Fixed atp at every 200 meters on mainline , this is called as ENHANCE TRAIN LOCATION SYSTEM
# AFO ( Audio frequency overlay ) ::
AFo IS HAVING 2 ANTENNAS
ECA 1 ANTENNA : 2365 Hz
ECA 6 ANTENNA : 1660 Hz
# invalidation
Afo वरून 50 sec मध्ये ट्रेन pass झाली पाहिजे
Afo वर 5 sec च्या वर ट्रेन नाही थांबली पाहिजे
Afo eauipment failure नाही पाहिजे
Overspeeding
वरील 4 reason मुळे ट्रॅक invalid होतो
ATP shows approx train location
AFO shows accurate train location
Caution Order :
1. It is written / verbal
2. Speed VARIABLE असेन तेव्हा
3 हे कोणत्याही मधल्या location ला असू शकते
TSR:
1. SOftware based
2. SPeed 25 kmph
3. Block section लाच दिला जातो .
#ERP :
1.ONLY DONE BY STATION MASTER
2. STATION WITH BEAM SWITCH
3. SWITCH MOVEMENT
# ESP :
1. AT ALL STATION
2. ANYONE CAN OPERATE
LCP : BEAM FAILURE च्या वेळी केलं जाते
No comments:
Post a Comment